Beginning Wednesday, June 10, 2015, at 7:00 a.m., the following streets will be closed to all traffic due to sanitary sewer construction & a RR crossing removal on June 12th will close another street. ‘Read more’ for details.
• 9th Avenue North, from the boat ramp entrance to Wendy’s drive through exit. This closure will remain for a maximum of 2 weeks.
• Riverview Drive will be closed to through traffic from 6th Avenue North to 9th Avenue North. Access to all marina amenities will still be available from Riverview Drive. This closure will remain for a maximum of 2 weeks.
• Roosevelt Street, from 9th Avenue North to 11th Avenue North, on both sides of the railroad tracks. This closure will remain until Friday, July 3, 2015.
—-
On Friday, June 12, 2015, from 7:00 a.m. until 5:00 p.m., South 19th Street, from Manufacturing Drive to Harrison Drive, will be closed due to removal of the South 19th Street railroad crossing. This crossing will be removed and the void will then be filled with asphalt paving. This street closure is not expected to last for more than 10 hours.
Please contact the Engineering Department at 563.244.3423 with any questions.