Inspection of U.S. 30 Mississippi River bridge begins October 4

The Illinois Department of Transportation announced today that, weather permitting, an inspection of the U.S. 30 Mississippi River bridge (Gateway Bridge) crossing the river from Clinton to Whiteside County, Illinois will begin Monday, October 4.
The work will require a daily closure from 8:30 a.m. to 3:30 p.m. starting in the eastbound lane before later shifting to the westbound lane. One lane of traffic will be maintained during the inspection, which concludes Friday, October 7.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.
For IDOT District 2 updates, follow us on Twitter at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

About Dave Vickers

Dave has been News Director since 1983 and has been Station General Manager since 1999. Dave has also served on the Board of Directors of the Iowa Broadcast News Association and the Iowa Broadcast Association and has served on the Iowa Freedom of Information Council.
View all posts by Dave Vickers →